The project is aimed at replacing and upgrading of the segments of high voltage cables which make up the 11kv ring mains of the Escravos process unit
The following construction/ Installation works are carried out:
- * Excavation and backfilling of cable route
- * Breaking of substations floors and restore all broken floors according to company
- approved design drawings
- * Road / drainage crossing
- * Pulling and installing a total of about 6,000 meters of 2x 3Cx 95mm² 11kv cables
- * Installation of cable slab and caution tape
- * Installation of caution tape on top of cable slab along cable route
- * High voltage switching by company's rep
- * Termination of cables at RMU'S
- * Installation of plastic tags on all utility ring substation terminals